top of page

METAENERGIA Open Cycle Power Plant 72MW:

  • davidh192
  • Sep 13, 2022
  • 1 min read

FATA signed the EPC contract for the construction of a 72MW open cycle power plant of METAENERGIA. The plant, will be built in the Termoli industrial area, consists of n.4 WARTSILA 18V50SG gas engines of 18MW each. The engines will be produced in the WARTSILA factory in Trieste.





 
 
 

Recent Posts

See All

Comments


bottom of page