top of page

NextDecade Seeks FERC Approval for CCS at Rio Grande LNG:

NextDecade Corp. has filed an application with FERC to include carbon capture and sequestration (CCS) systems at its proposed Rio Grande liquefied natural gas export project in Brownsville, TX. The system at Rio Grande would allow the terminal to capture and sequester 90% of the carbon dioxide (CO2) produced. From 2000 thru 2003, a pilot capture plant operated on site for three years and captured approximately 1M metric ton of CO2.

FULL STORY


McCoy CCUS Project ID: 75647

0 views

Recent Posts

See All

UK energy infrastructure developer Carlton Power has received planning consent to develop the 200 MW Trafford Green Hydrogen scheme. The proposed £300 million scheme is aimed to produce and store hydr

bottom of page